A step by step Procedure of Implant Placement with IS-III active Fixture in the right Mandibular 2nd Premolar Area

허영구 원장님 Dr. Heo

Author
Dr. Young-Ku Heo, DDS, MDS, PhD

Director of Global Academy of Osseointegration
Seoul, Korea



슬라이드2
Pre-op panorama
The patient was a 59-year-old male with no significant health history except for hypertension.
Clinical examination revealed a failing fixed partial denture (#44=46) due to severe secondary caries around the crown margins of both #44 and 46.
The treatment plan for the patient was to place an implant at #45 site after removal of the previous prosthesis.

슬라이드3
Intra-oral photograph

슬라이드4
Flap reflection

슬라이드6
Point drill

슬라이드9
Ø 2.2 drill

슬라이드10
Ø 3.0 drill

슬라이드11
Ø 3.5 drill

슬라이드12
Ø 4.0 Cortical tap

슬라이드13
IS-III active Ø 4.0*10mm was placed.

슬라이드14
The insertion torque value was 30 Ncm, which was sufficient for performing the one stage approach.

슬라이드15
Bone profile

슬라이드17
Healing abutment was connected.

슬라이드18
After the surgery

슬라이드19
Post-op panorama

슬라이드20
Periapical radiograph

슬라이드21
Click on the image to see clinical video.

This case presents a step by step procedure of implant placement with Neobiotech IS-III active fixture on #45.

1372 Total Views 2 Views Today
0 Comments

Leave a reply

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Copyright (c) GAO Forum. All Rights Reserved.

 

Forgot your details?