SCRP (Screw & Cement Retained Prostheses)

7-month result of Immediate Placement using a precision Neo NaviGuide and Immediate Loading with a definitive 2-unit FPD in the posterior mandible

슬라이드32

Immediately placed implant after extraction on the Mandibular 2nd premolar and 1st Molar Area using Neo NaviGuide.

Continue reading

Immediate placement and loading with provisional screw retained crown at #21

C1_Anterior_feature

***3 years follow up result has been added*** This case presents immediate placement and loading with CT graft right after the extraction of tooth 21. The procedures are detailed step-by-step with practical advice.

Continue reading

The Utilization of RFA Assessments for Early (Anytime) Loading in the Maxillary Posterior Area

80_17

This is the final restorations – a single restoration for #24 and a 3-unit FPD for #25-27 – fabricated and delivered in 4 weeks. The ‘SCRP’ abutments (prefabricated abutment with semi-hexa connection) were used to ensure the insertion path of the restoration. 

Continue reading

The staged approach on atrohpic ridge using NeoBiotech IS II active fixture and nonresorbable membrane

74gbr16

A 60 year old female patient came to the clinic with horizontal bone resorption which had been progressed due to the extractions of #36 and #37. The atrophic ridge was grafted with a combination of Xenobone and allobone, then a nonresorbable membrane was placed over it. After 4 months of the stage...

Continue reading

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Copyright (c) GAO Forum. All Rights Reserved.

 

Forgot your details?