Immediate/ Early/ AnyTime loading

A step by step placement in the left mandibular area: from surgical to prosthetic completion

C17_Anytime_26

 A 50 year old male patient came to the clinic presenting loss of #36, #37 & #47 and complains of difficulty in chewing tough food. This case shows the procedures from surgical to prosthetic completion on site #36 and #37.

Continue reading

Immediate placement and loading in the mandible with the CMI IS II active implant

61C31

A case presented with severe gingival hyperplasia and #34 root fracture. The hopeless teeth including #34 root were extracted and immediate transitions were made. CMI IS ll active implants were used to replace the natural teeth.

Continue reading

Wide implant placement in the sinus-lifted maxilla and native bone

58C10

This case presents replacement of failed implant with ф6.0*7.0mm Neobiotech S-wide EB implant on site 16. Site preparation was done with S-reamer and no grafting was conducted. Implant was placed with 1-2mm of sinus involvement and has achieved inferior cortical fixation with 45N/cm of excellent stability. Immediate loading was performed...

Continue reading

“Immediate full arch rehabilitation” : with Neobiotech implant system

65C00

This case presents insertion of immediate same day implant supported fixed prosthesis which involves full mouth extraction, placement of 4 maxillary and 4 mandibular implants without any grafting and loading of these implants with provisional fixed hybrid prosthesis which is converted from immediate complete dentures. All these is done...

Continue reading

Esthetic restoration in the anterior mandible

34C_Anterior_thumb

A 57 year old female patient was referred to the clinic to replace the mandibular anterior incisor which was considered hopeless due to bone resorption caused by advanced periodontitis. With the extraction of #41, S-mini onebody implant was immediately placed with 20Ncm of primary stability, and the defect was filled with...

Continue reading

Immediate placement and loading in the posterior mandible

C4_Anytime_15

This case presents 3 external implants (CMI EB) immediately placed with 45Ncm of insertion torque values on the edentulous mandibular left quadrant and a definitive 3 unit SCRP prosthesis delivered 3 weeks after implants placement.

Continue reading

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Copyright (c) GAO Forum. All Rights Reserved.

 

Forgot your details?