Tag Archive for: GBR Kit

GBR and simultaneous implant placement in the narrow alveolar ridge

C9_GBR_thumb

This patient presented with extremely narrow ridge after the extraction socket of #26 was allowed to heal for 8 weeks. A 3 unit cement retained PFM FPD was delivered 4 months after GBR was conducted using titanium mesh.

Continue reading

Vertical augmentation in esthetic zone using CTi –Mem Ti mesh

47C_GBR_14

A 21 year old male patient came to the clinic due to esthetic problem of the ankylosed maxillary right central incisor. The tooth was immediately replaced with an implant following tooth extraction and a simultaneous xenograft was applied to the defect.

Continue reading

Ridge augmentation and implant placement using CTi-mem and IS ll active implant

C20_GBR_0

A 30-year-old female patient had lost teeth 36 and 37 and was referred to the clinic for treatment. Prior to the implants placement, ridge augmentation was first conducted on the mandibular left quadrant using CTi-mem and Tent screws. *The 2 year follow-up verifying stability of peri-implant bone is added.

Continue reading

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Copyright (c) GAO Forum. All Rights Reserved.

 

Forgot your details?